The Diagram above demonstrates how the Main Line is accessed via the
Clean-Out and is hydro-jetted (cleaned with high pressure) toward and into the Septic Tank to include the inlet or front baffle
tee.
Once again, the Red Lid on the Clean-Out represents the Back Flow Prevention
Device, which will automatically open in the event of a back flow, thus alerting you to the septic system problem.